Tuesday, August 5, 2008

30 days project report

Looking back at my initial plan the bike should have been on the road by now, however my challenges have been related to lost  and delayed shipments.

Lets start with run down of what has been accomplished to date.

Rear End: Wheels came off a 2008 heritage, harley managed to change the bearing size and the hub for this year which resulted in some modifications to the rear pulley and spacer.

Rear End

  • Bearing changed from 1 inch  to 3/4"
  • Bushing cut and welded to match 3/4" axle
  • New rear wheel spacer fabricated and chromed
  • Rear fender downsized to 6.5" originally 7.5"
  • Struts Cut
  • New Brake Disc
  • New Pads
  • New Tail Light
  • Wiring still needed
  • Seat is in Place
  • New old school round oil tank copper coated and mounted
  • Lowering Kit
  • Oil tank Fittings
  • Rear turn Signals

Engine

  • New Cam
  • Cam bearings
  • Gaskets
  • Carburetor
  • Pistons
  • Cylinder Bored
  • Air Filter
  • Jetting
  • Coil Relocation
  • Valve Springs
  • Pushrods
  • Easy Clutch
  • Clutch Cable
  • Primary Gasket

Front End

  • 1" Axle
  • Spacers
  • Front Caliper spacers
  • Spacer Chroming
  • Lower Fork Legs
  • Lowering Kit
  • Rubber covers
  • Triple Tree
  • Handlebar
  • Turn Signals
  • Wiring
  • Handlebar Bushings
  • Braided brake Line
  • Braided throttle cables

Body Work

  • Paint Job
  • Consol
  • Seat Pan

No comments: