Thursday, September 24, 2015
Saturday, October 23, 2010
The Final Curtain (almost)
Monday, October 18, 2010
The week end in review
Friday, October 15, 2010
Tail Gunner Exhaust Video 1 million Views
On its third posting anniversary posted on October 15, 2007. I am Truly overwhelmed by the number of hits that this video has generated. I would like to thank everyone for taking the time to view and comment on this short video. To be exact the number of views are 1,063,806 to date and counting.
Thursday, October 14, 2010
Bummer!
Phase one of the bike is done, however before I move on to cosmetical enhancement. I will have to deal with the no pressure issue, which by a mismounted spacer. Shit Happens! luckily the engine never run more than 10seconds at the time, when I discovered the oil light was not shutting off. Oh well I guess Saturday will be spend on tearing the cam plate and front end to be lowered. In the Meantime you can enjoy the new scheme.
Tuesday, October 12, 2010
T-2
Things have been progressing well so far! for the exception of the usual hiccups here and there. Yesterday was the front end revamp, I ditched the custom triple tree for a set of Deuce triple trees, black powder coated. Installed the Flanders bar, a nightmare of massive proportions, due the narrow holes. Changed my brake pads and installed the new powder coated switch housing. Today will be focusing on wiring and torquing all the bolts and hopefully get the Stormer fired up.
Monday, October 11, 2010
Deja Vu
I have previously posted in regards to the Flanders TT Bars, well nothing have changed, in terms of quality and adding insult to injury, the machined holes drilled for internal wiring have extremely sharp edges which resulted in ripping the protective plastic cover on my controls wiring. You would expect better workmanship for a $200 handlebar. Nevertheless they remain the most confortable aggressive bars on the market!
Progress Report
Over the past couple of days, I have struggle in putting the bike together. Mundane installation has proved to be nightmares. The swing arm, took over 2 hours to install, I usually do it in 20 minutes. it was not my day. The way things are looking now is as follows, 90% of my parts to be powder coated are done. The result is beyond satisfactory. The rear end is bolted back together the engine covers are back in place. I started stripping the front yesterday to install the Flanders handlebars, still some work to be done , I hope my progress is 90% by tonight. Leaving the tank and electrical to be dealt with, over the course of tomorrow.
Saturday, October 9, 2010
Powder Coating Challenges
Since glossy powder is not available in Kuwait I have decided to ship 2 LBS form the US. After delivering my parts to the coater, I was supposed to receive them on Thursday, unfortunately the cops raided his shop checking for illegal immigrants (Welcome to Kuwait), which resulted in a delay. I will check back with him tomorrow as I need to finish this build by Wednesday at the latest!
Todays Progress
Today was a hectic day, started work at 16:30 and finished around 23:00. Oil Tank is back in place. New Oil Cooler installed, unfortunately I did not have a new oil filter, will get one tomorrow. Swapped my cams for a set of used TW8 as the the 6H were too torquey and has costed me 2 sets of clutches. Since I have already installed the new Screaming eagle hydraulic cam plate it was somehow easy to remove the cams. The 6H were mounted with a woodruff key which posed some challenge. The rocker arm base plate was a bit damaged by the high lift cam and needs some grinding, will take care of it, first thing in the morning.
Friday, October 8, 2010
Sticking to a proven formula
Each bike build has a distinctive style and each time we strive to outdo ourselves with budget constraint off course. My bike building policy is simple, keep it as close to stock as possible, so when if you need to sell it at certain point in time the custom aspect will not make people think twice about custom engines and part that are not available in this market,
Keep your frame stock
If you mod your tank keep the original at hand
Same goes for fender wheels etc…
Engine keep it HD
Now the enhancement are not only cosmetic. Lets tart with the frame, Lower rear and front, do not rake the bike if you plan on travelling. You can change the tires and rims, Rear you can go up to 200mm on a stock swing arm using stock HD parts, such as pulley and belt, rims from 16X5.5” – 17X6” even 18”, you only need to manufacture the spacers and grind the caliper and swing arm.
The Front I have opted for 180mm mounted on a 16X4.25” rim, you can go up 5.5” but want be able to fit a 200mm. I do recommend a fender to protect you from drainage water, its cool to drive without a fender, not that cool if you run into sewage water!
Drivability, the combo of 200+180 is a killer, the bike feel and handle like a sports bike, make sure that you r exhaust is high, RSD tracker is a good example of high clearance exhaust, yes your Harley will lean till you grind your foot pegs.
Handle Bars ape bars are cool if you wanna pose on the bike, if you are into serious thrashing, get a low bar, I opted for a mantel bar. Giving better control over my bike.
Seat console etc is stock HD crossbones of eBay.
Nest Post will cover the engine mods!